Our Production Technology


Our Machinery and Technologies Used in Production

Sheet Metal Processing CNC Punch Machine
Sheet Metal Processing CNC Punch Machine

Sheet Metal Processing CNC Punch Machine

  • Cutting, Drilling and Forming operations are performed on our CNC Punch Machines.
Sheet Metal Processing CNC Press Brake-1
Sheet Metal Processing CNC Press Brake-1

Sheet Metal Processing CNC Press Brake-1

  • Twisting and bending operations of sheet metal parts are performed on CNC Machines.
Sheet Metal Processing CNC Press Brake-2
Sheet Metal Processing CNC Press Brake-2

Sheet Metal Processing CNC Press Brake-2

  • Twisting and bending operations of sheet metal parts are performed on CNC Machines.
Sheet Metal Processing CNC Polyurethane Gasket Machine
Sheet Metal Processing CNC Polyurethane Gasket Machine

Sheet Metal Processing CNC Polyurethane Gasket Machine

  • CNC polyurethane gasket casting machine provides gasketing of industrial products and protection up to IP68 in IP protection class through software.
Sheet Metal Processing Guillotine Scissors
Sheet Metal Processing Guillotine Scissors

Sheet Metal Processing Guillotine Scissors

  • It is used for cutting sheet metal.
Sheet Metal Processing Electrostatic Powder Coating
Sheet Metal Processing Electrostatic Powder Coating

Sheet Metal Processing Electrostatic Powder Coating

  • It is our machine that applies electrostatic paint to our sheet metal products.
Sheet Metal Processing Hydraulic Punch Press
Sheet Metal Processing Hydraulic Punch Press

Sheet Metal Processing Hydraulic Punch Press

  • It is used for hole and shaping process.
Sheet Metal Processing Gas Welding Machines
Sheet Metal Processing Gas Welding Machines

Sheet Metal Processing Gas Welding Machines

  • It is used for resource management and assembly of parts.
Sheet Metal Processing Spot Machines
Sheet Metal Processing Spot Machines

Sheet Metal Processing Spot Machines

  • Sheet Metal Processing Spot Machines
Sheet Metal Processing Stud Welding Machines
Sheet Metal Processing Stud Welding Machines

Sheet Metal Processing Stud Welding Machines

  • It is used to weld bolts to sheet metal parts.
Sheet Metal Processing Tig Welding Machine
Sheet Metal Processing Tig Welding Machine

Sheet Metal Processing Tig Welding Machine

  • It is used to join stainless products by welding method.
Sheet Metal Working Surface Cleaning Machines
Sheet Metal Working Surface Cleaning Machines

Sheet Metal Working Surface Cleaning Machines

  • Sheet Metal Working Surface Cleaning Machines
Sheet Metal Processing Eccentric Presses
Sheet Metal Processing Eccentric Presses

Sheet Metal Processing Eccentric Presses

  • These are our machines used to give form and shape to sheet metal parts with the help of special molds.
General Pneumatic Air Machines
General Pneumatic Air Machines

General Pneumatic Air Machines

  • Machines such as rivet nuts, torque wrenches, nut wrenches.
General Pneumatic Compressed Air System
General Pneumatic Compressed Air System

General Pneumatic Compressed Air System

  • It is our machine used for the operation of pneumatic machines.
General Generator
General Generator

General Generator

  • Generator system is used to minimize production interruptions during power outages.
General ERP Enterprise Resource Planning
General ERP Enterprise Resource Planning

General ERP Enterprise Resource Planning

  • It is our ERP program that helps automate and manage basic business processes.
General 3D Design Program
General 3D Design Program

General 3D Design Program

  • 3D drawing programs are used in the design of our standard or special products.
General Cad Drawing Programs
General Cad Drawing Programs

General Cad Drawing Programs

  • It is a program that helps us make 2D drawings such as electrical projects and panel views.
General CAM Sheet Metal Processing Program
General CAM Sheet Metal Processing Program

General CAM Sheet Metal Processing Program

  • It is our CAM program used in our CNC sheet metal working machines, which allows us to perform sheet metal processing and forming works without any errors.
General Transport and Stacking Machines
General Transport and Stacking Machines

General Transport and Stacking Machines

  • These are machines such as forklifts and pallet trucks that help transport and store our products.
Electroassembly CNC Copper Machining
Electroassembly CNC Copper Machining

Electroassembly CNC Copper Machining

  • It is our machine that performs cutting, drilling and bending operations on electrolyte copper busbars used in our company.
Electroassembly Copper Processing
Electroassembly Copper Processing

Electroassembly Copper Processing

  • It is our machine for cutting electrolyte copper busbars used in our company.
Electromontage Automatic Cable Cutting
Electromontage Automatic Cable Cutting

Electromontage Automatic Cable Cutting

  • It is our machine that automatically cuts and ends the cables used in our assembly applications.
Electromontage Labeling Laser Engraving Machine
Electromontage Labeling Laser Engraving Machine

Electromontage Labeling Laser Engraving Machine

  • It is our laser engraving machine used in labeling our products.
Electromontage Labeling Cable Tube
Electromontage Labeling Cable Tube

Electromontage Labeling Cable Tube

  • This is our machine that allows cables to be labeled with tubing.
General Testing and Calibration Devices
General Testing and Calibration Devices

General Testing and Calibration Devices

  • CE Multitester, paint thickness gauge, torque wrench are our testing devices used in the quality control stages of our products.
Electromontage Labeling Plotter
Electromontage Labeling Plotter

Electromontage Labeling Plotter

  • It is our machine used for labeling products used in panels such as terminal blocks and cables.
Contact Us WhatsApp
WhatsApp